About the Client
JVC is a Japanese consumer electronics brand with its European headquarters based in London. As one of the world’s leading manufacturers of audio-visual equipment, the business required a large-scale mezzanine floor installation at its European HQ to maximise usable floor space within an existing warehouse facility.
What Were They Trying to Resolve?
JVC’s European headquarters required a large-scale increase in usable floor space to support the operational demands of a major consumer electronics business. An intermediate mezzanine floor, sitting between ground floor and existing upper levels, was specified as the most effective way to add significant additional capacity within the existing building. The key objectives were:
- Add 8,000 sq ft of usable floor space without extending or relocating the facility
- Deliver a compliant intermediate mezzanine structure to fit between existing building levels
- Provide safe stair access and handrailing to meet Building Regulations requirements
- Complete the project with minimal disruption to the operational running of the European HQ
Scope of works
- Design, production and installation of an 8,000 sq ft intermediate mezzanine floor within the existing warehouse facility
- Stair access to the new mezzanine level
- Safety handrailing to all open edges
- Full Building Regulations compliance throughout
What was the result?
Western Industrial designed and installed an 8,000 sq ft intermediate mezzanine floor at JVC’s London European HQ in April 2010. The intermediate structure was engineered to fit within the specific storey height and structural conditions of the existing building, adding a full additional operational level without extending the building footprint.
The project was completed on programme with full Building Regulations approval, giving JVC a significant increase in usable floor space at their European headquarters.
Upgrade Your Business Today
Working with a large commercial or industrial facility that needs more floor space? Western Industrial has been designing and installing mezzanine floors across the UK for more than 45 years. Contact us to discuss your project and arrange a free survey.
Frequently Asked Questions
An intermediate mezzanine floor is a raised floor level installed between two existing floor levels of a building, using the available height between stories to add usable space. It differs from a standard mezzanine in that it must be designed to fit precisely within the structural and dimensional constraints of the existing building above and below.
An 8,000 sq ft mezzanine floor is a large-scale structural installation requiring detailed engineering design, significant steelwork and careful site management. Western Industrial manages the complete process from initial survey and structural design through to installation, Building Regulations approval and final handover.
Large mezzanine floor installations in operational facilities are typically phased to minimise disruption to the business. Western Industrial will agree a programme of works with the client before starting on site, ensuring that the installation is sequenced to keep any operational disruption to the minimum necessary.
Large commercial mezzanine floors require approval under multiple parts of the Building Regulations, typically covering structural integrity (Part A), fire safety and means of escape (Part B), and protection from falling (Part K). Western Industrial manages the full approvals process as part of every project.